MIL-PRF-38534K Compliance Testing
MIL-PRF-38534K Group C
Test | Method | Conditions (PI) |
External Visual | 2009 | |
PIND | 2020 | |
Temperature Cycling | 1010 | C, 20 Cycles |
Temperature Cycling | 1010 | C, 10 Cycles |
Mechanical Shock | 2002 | B, Y1 Direction or 3000 g's, Y1 Direction |
Seal (Fine and Gross) | 1014 | |
Visual Examination | 1010 | |
Endpoint Electrical | * | |
Steady state life | 1005 | 1000 hours at 125°C or equivalent (1005) |
Endpoint Electrical | * | |
Internal Water Vapor | 1018 | |
Internal Visual and Mechanical | 2014 | |
Wire bond strength | 2011 | |
Element Shear | 2019 | |
ESD | 3015 | |
* in accordance with the applicable device specification |
MIL-PRF-38534K Group D
Description | Method | Condition (PI) |
Thermal Shock | 1011 | C |
Stabilization Bake | 1008 | 150°C, 1 Hour |
Lead Integrity | 2004 | B2 |
Seal (Fine and Gross) | 1014 | A, D |
Salt Atmosphere | 1009 | A, D |
Metal Package Isolation | 1003 | 600 V DC , 100 nA Max. |
MIL-PRF-38534K Group K
Test | Method | Conditions (PI) |
Preseal Burn-in | 1030 | |
Non-Destructive Bond Pull | 2023 | |
Internal Visual | 2017 | |
Temperature Cycling | 1010 | C, 10 Cycles |
Mechanical Shock or Constant Acceleration | 2002/2001 | B, (Y1 Direction) 3000 g's, Y1 Direction only |
PIND | 2020 | Condition A shall be used for Class K, unless otherwise specified. |
Pre Burn-in Electrical | * | |
Burn-in | 1015 | |
Final Electrical Test | * | |
Seal (Fine and Gross) | 1014 | |
Radiographic** | 2012 | |
External Visual | 2009 | |
* in accordance with the applicable device specification ** Will be designed to meet requirements, but Radiographic Test Results not included. |